Guides for people who review construction documents

Written by the ParitySense team · Australian standards & workflows · no fluff

Document control

PILLAR GUIDE

Construction Document Control: Complete Guide

How document control actually works on Australian construction projects: registers, revisions, superseding, transmittals, and where automation fits.

Drawing Register Best Practices

How to build and maintain a construction drawing register that survives an audit: fields, revision history, supersede status and issue records.

Unclouded Revision Changes: The Hidden Defect

Unclouded changes are the highest-risk defect in drawing revision management. What revision clouds are, why changes slip through, and how to catch them.

Superseding Documents Without Losing History

Why superseding should be a status change, never a deletion. Audit trails, dispute evidence and non-destructive revision management on projects.

Title Blocks & Drawing Numbering Done Right

Consistent title blocks and document numbering are the foundation of automated document control. What to standardise and why extraction fails without it.

Compliance checking

PILLAR GUIDE

Checking Docs Against Australian Standards

A practical guide to reconciling drawings, schedules and specifications against each other and Australian Standards — discipline by discipline.

Fire & Acoustic Door Schedule Compliance

Reconciling door tags, FRL and Rw ratings across drawings, door schedules and fire engineering documents — and why the schedule is usually the stale one.

Wet Area Waterproofing Docs Under AS 3740

Membrane extents, falls and setdowns: what AS 3740 wet-area waterproofing documentation must show, and where drawing sets routinely fall short.

Accessibility (AS 1428.1) in Design Documents

Door circulation, ramps and accessible WCs under AS 1428.1: where design documentation fails geometrically and how revisions quietly break compliance.

AS 1288 Safety Glazing: Documentation Gaps

Where AS 1288 requires safety glass, why window schedules miss it, and how to reconcile glazing types across plans, schedules and specifications.

BAL Ratings & AS 3959: Drawings That Match

Making drawings match the bushfire assessment: how BAL requirements under AS 3959 flow into windows, decks and roofing, and where flow-through fails.

Geotech Report vs Footing Design (AS 2870)

Site classification under AS 2870, the geotech report's recommendations, and the footing design: the cross-check that almost nobody performs.

Tender & contract risk

PILLAR GUIDE

Tender-to-Contract Risk: The Complete Guide

Why the signed contract set differs from the priced tender set, where the risk hides — addenda, substitutions, scope drift — and how to review the delta.

Tender vs Contract Documents: A Practical Method

A discipline-by-discipline method for comparing tender and contract document sets, classifying every difference by budget, program and scope impact.

Order of Precedence Under AS 4000 Explained

How AS 4000 resolves conflicting contract documents through order of precedence, and why your document review should resolve conflicts the same way.

RFI Best Practice: Getting Answers, Fast

RFIs that actually get answered: numbering discipline, one question per RFI, cited evidence, time-bar awareness, and why you never delete an RFI.

Addenda Management in Tender Periods

How to trace every tender addendum through the document set: an amendment matrix, superseded-revision control, and pricing that survives addendum five.

AI in document review

PILLAR GUIDE

AI Construction Document Review: Honest Guide

What AI genuinely does well in construction document review, where it fails — hallucination, missing context — and what to demand from any tool.

Evidence-Gated AI Findings Explained

Why an AI finding without a citation is worthless: evidence gates, quarantine trays, and the difference between a defensible finding and a guess.

AI and Professional Sign-Off in Construction

Why AI must never sign: the certifier's accountability, what a review aid can and cannot carry, and how audit trails make AI-assisted review defensible.

Reviewing a package this month?
Run it through ParitySense alongside your manual review and measure the delta.
See how it works