Built from published industry research, not guesswork. Every assumption is on the page — change any number to match your portfolio.

$3.9Ma year in time and rework

19,113 hours back · about 11 full-time people

RFIs drafted$1.9M
Rework avoided$988k
Revision checks$591k
Drawing register$221k
Tender reviews$120k

Before disputes, delays and liquidated damages — which we leave out.

How we calculate

Conservative by design.

Where research gives a range, we use the low end.

SavingHow it's worked outBasis
RFIs draftedRFIs per $1M of construction × portfolio value × complexity. Half are raised from a document conflict the agents found; drafting one with the evidence attached saves 1.5 of the ~2 hours it takes by hand.17.2 RFIs per $1M on $5–50M projects, falling to 1.1 on $1–5B; ~8 hours per RFI across both parties [Navigant]
Rework avoidedPortfolio value × field rework rate × share of rework caused by poor data × the share the agents help prevent (you set it).Rework 0.76% of contract value [Love 2026] — older studies put it at 2–12%; 52% of rework from poor data and miscommunication [FMI]
Revision checksSheets × issues a year × minutes saved: by hand every sheet is compared; with ParitySense the reviewer checks only the listed changes (a quarter of sheets, 3 minutes each).Sheets per project scale with value and complexity (100 + 5 per $1M)
Drawing register2 minutes a sheet to key a title block by hand, versus a 10-minute spot-check of what the agents read.Our assumption — change it with the sheet count
Tender reviewsOne tender-to-contract review per project: about 40 hours side by side, versus 8 hours reviewing the agents' list.Our assumption, scaled by complexity

A full-time person is 1,720 hours a year. Figures are estimates for planning, not a guarantee.

Not counted

The biggest numbers aren't in the total.

Errors and omissions in contract documents were the leading cause of construction disputes in North America in 2024, where the average dispute was worth US$60.1M [Arcadis]. Large projects typically run 20% late and up to 80% over budget [McKinsey]. One avoided dispute can be worth more than everything above.

14.1 h

a week per person lost to searching for data, resolving conflicts and fixing mistakes [FMI]

796

RFIs on an average project, with a median reply time of 9.7 days [Navigant]

Sources

  1. Navigant Construction Forum — Impact & Control of RFIs on Construction Projects (2013), Aconex data on 1.08 million RFIs across 1,362 projects.
  2. Love — How much does field rework in construction actually cost? (ASCE, 2026), reporting his Journal of Construction Engineering and Management study.
  3. FMI and PlanGrid — Construction Disconnected (2018), survey of nearly 600 construction leaders.
  4. Arcadis — 2024 Construction Disputes Report.
  5. McKinsey — Imagining construction's digital future.

Check the numbers on your own project.

A pilot on one live project shows your real hours — not ours.