Home › Compliance checks
Compliance checks
Catch compliance gaps before the surveyor does.
Specialist agents for fire, access, wet areas, glazing and more check every set against the building code — starting with the NCC and Australian Standards. Each finding is outlined on the drawing, with the clause behind it.
≈ $988k a yearof rework stopped at the desk, for a 25-project contractor.
The industry’s 1-10-100 rule of thumb · see the calculator.
What changes for your team
Less reading. Fewer surprises.
Today
- Checks done from memory, under deadline
- Plan and schedule disagree, unnoticed
- Gaps found at certification — or on site
With ParitySense
- Twelve checks on every set, scoped by discipline
- Findings cite the drawing, the document and the clause
- Honest about gaps: a check that can’t run says NOT RUN
A day on site
Before tender, the BCA consultant runs the checks. Two fire doors disagree between plan and schedule; the waterproofing extents are missing from one wet area. Each opens on the drawing, ready to confirm.
Illustrative scenario.
Questions
Which checks are included?
Fire & acoustic doors, drawing register, tender addenda, accessibility (AS 1428.1), fire compartmentation, waterproofing (AS 3740), contract precedence, scope of works, finishes & slip rating, glazing (AS 1288), bushfire (AS 3959) and geotech-footing.
Is this a certification?
No. ParitySense is a review aid. Findings require professional judgement and sign-off.
Which NCC edition does it use?
The checks reference current Australian Standards; confirm the edition applying to your permit with your building surveyor.
Read more: A guide to construction compliance checking
More from ParitySense
Revision check
Know what changed in a new issue — including the edits nobody clouded.
Revision check →Drawing register
A register that keeps itself current. No typing, no stale sheets.
Drawing register →RFI register
RFIs drafted from the evidence, on time and on the record.
RFI register →Tender vs contract
Find the cost hiding between what you priced and what you sign.
Tender vs contract →See it on your own drawings.
A 30-minute demo, or a pilot on one live project.